Construction of 1.9 km RCC Protection Wall at Leswa Mouth on Main Neelum Valley Road by PWD Highways Division Neelum

Submission deadline 16 Dec 2026, 11:30 18 days left
Bid opening16 Dec 2026, 11:31
Estimated valueRs 160,548,000
Bid securityRs 4,830,000

Similar works tenders

All works →
Newspaper clipping of the notice: Construction of 1.9 km RCC Protection Wall at Leswa Mouth on Main Neelum Valley Road by PWD Highways Division Neelum
The notice as printed in Daily Dunya, 28 Nov 2026. The clipping is the authoritative text. View full size

What is being procured

The Office of the Executive Engineer PWD Highways Division Neelum invites applications for prequalification for the remaining work for construction of a 1.9 km RCC protection wall at Leswa Mouth on Main Neelum Valley Road, District Neelum, Azad Jammu and Kashmir. The Government of the State of Azad Jammu and Kashmir has provided funding for the project. The estimated cost is Rs. 160.548 million, and the required bid security is Rs. 4.830 million. The invitation to bid is expected to be issued by January 2027.

Prequalification is open to constructors registered with the Pakistan Engineering Council in category C-4 and above, with specialization codes CE-01 and CE-10. Appropriately registered constructors may download the prequalification documents from the E-Bidding Dashboard. Detailed qualification criteria are contained in those documents. Only firms of constructors and joint ventures prequalified through this process will subsequently be invited to bid.

Prospective bidders must obtain their username and login details from the IT Section, Office of the Chief Engineer Highway Muzaffarabad, Block H, DHQ Muzaffarabad, and receive the necessary training on the bidding procedure. Bidders and firms already electronically registered with the department may use their existing username and login.

Applications for prequalification must be uploaded in PDF format to the prospective bidder's E-Bidding Dashboard by December 16, 2026, at 11:30 AM. The E-Bidding System will open the applications on the same day at 11:31 AM, and the list of participants will be visible to participating bidders.

Applicants must deposit the required bid security in cash into one of the designated divisional joint accounts and upload the bank receipt with their prequalification application. Failure to upload the receipt will result in disqualification. The designated banking options include Soneri Bank Limited, CMH Road Branch Muzaffarabad; Bank of AJK, Upper Adda Branch Muzaffarabad; Bank of AJK, Athmuqam Branch, through its arrangement with Faysal Bank Limited; Habib Metropolitan Bank Limited, Domel Muzaffarabad; Faisal Bank, Ghari Pan Chowk Branch Muzaffarabad; and United Bank Limited, Athmuqam Branch.

A pre-bid meeting will be held on December 10, 2026, at 11:00 AM in the office of the Superintending Engineer PWD Highways Circle, First Floor Block-H, District Complex Muzaffarabad. Applicants will be informed of the evaluation results. The employer reserves the right to accept or reject any bid.

Contact Engineer Zahoor Ahmed, Executive Engineer PWD Highways Division Neelum, at 05821-920057. The notice is also available at https://ajkppra.gov.pk/ and https://cwd.ajk.gov.pk.

Documents, submission and contact

Documents from
E-Bidding Dashboard
Submit to
Prospective bidder's E-Bidding Dashboard
Opening venue
E-Bidding System
Contact
Engr Zahoor Ahmed — Executive Engineer PWD Highways Division Neelum
Phone
05821-920057

Published in

Listed from a public newspaper advertisement. Verify dates, fees and submission requirements with Office of the Executive Engineer PWD Highways Division Neelum before bidding. Listing PT-3793. Report an error · Corrections policy

Pinch to zoomScroll or double-click to zoom
Newspaper clipping of the notice: Construction of 1.9 km RCC Protection Wall at Leswa Mouth on Main Neelum Valley Road by PWD Highways Division Neelum
StatCounter - Free Web Tracker and Counter