Live · Thursday, 12 November 2026 1,757 tenders 1,146 open 73 closing today 426 this week +152 this morning Install app Archive RSS Contact
PakistanTenders.pk Daily digest
Browse Goods676 Works509 Auction269 Services227 Consultancy76 Notices27 Closing today73 This week426 Corrigenda EOI
Works 8 days left

Road Upgradation, Model Road Development and Canal Bank Road Improvements by Lahore Development Authority, UD Wing

Submission deadline 20 Nov 2026, 09:30 8 days left
Bid opening20 Nov 2026, 10:00
Bid security5% of bid value
MethodSingle stage, two envelope
Newspaper clipping of the notice: Road Upgradation, Model Road Development and Canal Bank Road Improvements by Lahore Development Authority, UD Wing
The notice as printed in Daily Dunya, 31 Oct 2026. The clipping is the authoritative text. View full size

What is being procured

Lahore Development Authority, UD Wing invites item-rate bids for four works through the Punjab e-Procurement System under the single-stage, two-envelope procedure, PPRA Rule 38(2)(a). Engineering firms and contractors must be registered on the Punjab e-Procurement System, hold a valid Pakistan Engineering Council licence in the relevant category, and have active NTN and PNTN registrations.

The first work is upgradation and improvement of Atta Bakhsh Road from Azam Chowk to Ring Road, Lahore. The estimated cost is Rs. 211,666,575, with bid security of Rs. 10,583,329, a six-month completion period and PEC category C-3 or above. The second work is painting Jangla at Canal Bank Road from Doctor Hospital to Mall Road, Lahore. Its estimated cost is Rs. 37,921,381, with bid security of Rs. 1,896,069, a three-month completion period and PEC category C-5 or above.

The third work is transformation of Ferozepur Road into a model road through urban regeneration and sustainable development from Nishtar Depot to Pak Arab Society, including walkways, parking areas, facade uplift and allied works. Its estimated cost is Rs. 247,683,186, with bid security of Rs. 12,384,159, a six-month completion period and PEC category C-3 or above. The fourth work is signage upgradation of Canal Bank Road from Jinnah Underpass to Mall Road, Lahore. Its estimated cost is Rs. 140,135,182, with bid security of Rs. 7,006,759, a four-month completion period and PEC category C-4 or above.

Firms may register and obtain the technical and financial bidding documents through https://ep.punjab.gov.pk/. Documents will be available immediately upon uploading of the notice. Technical and financial proposals must be uploaded as PDF files through this system under Regulation 6(4) of PPRA Regulations 2024. Technical bids must meet the evaluation criteria. Financial bids must quote rates and amounts in figures and words according to the bill of quantities, and tender rates and documents must be signed as directed. Bids by post or telegram will not be accepted.

The submission deadline for all four works is 20 November 2026 at 09:30. Technical opening for the first, third and fourth works is scheduled for 20 November 2026 at 10:00. The opening date listed for the painting work is 20 November 2025 at 10:00. Financial proposals of technically responsive bidders will be opened after announcement of the technical evaluation results, at a separately communicated date and time. If the opening day is a public holiday, opening will take place on the next working day.

Digital bid security equal to 5% of the estimated cost must accompany each e-bid in favour of Lahore Development Authority, processed through the Punjab e-Procurement System in collaboration with Bank of Punjab. Corrupt or virus-infected submissions will be rejected. Conditional bids will not be accepted. Contractors are responsible for applicable taxes, and PPRA Rules apply. The issuing officer is Asrar Saeed Khan, Chief Engineer-I, LDA.

Documents, submission and contact

Documents from
Punjab e-Procurement System, https://ep.punjab.gov.pk/
Submit to
Punjab e-Procurement System, https://ep.punjab.gov.pk/
Contact
Asrar Saeed Khan — Chief Engineer-I, LDA

Published in

Listed from a public newspaper advertisement. Verify dates, fees and submission requirements with Lahore Development Authority, UD Wing before bidding. Listing PT-963.

Pinch to zoomScroll or double-click to zoom
Newspaper clipping of the notice: Road Upgradation, Model Road Development and Canal Bank Road Improvements by Lahore Development Authority, UD Wing
StatCounter - Free Web Tracker and Counter