What is being procured
Lahore Development Authority, UD Wing, invites item-rate bids for two construction schemes in LDA City, Lahore, through the single-stage, two-envelope procedure. Procurement will follow Punjab Procurement Regulatory Authority Rules 2014, as amended.
The first scheme is construction of missing links in Iqbal Sector, Gomal Road, and allied works. The estimated cost is Rs. 217,144,228, with bid security of Rs. 10,857,211. The completion period is five months. Contractors must hold a valid Pakistan Engineering Council licence in category C-3 or above.
The second scheme is construction of a brick wall and parking area for open space in Block-G and the adjacent area. The estimated cost is Rs. 46,007,093, with bid security of Rs. 2,300,355. The completion period is three months. Contractors must hold a valid Pakistan Engineering Council licence in category C-5 or above.
Participating engineering firms and contractors must be registered on the Punjab e-Procurement System, hold the relevant valid PEC licence, and have active-filer NTN and PNTN status. Firms may register by submitting the required information at https://ep.punjab.gov.pk/. Technical and financial bidding documents will be available on the system when the notice is uploaded.
Bidders must submit technical proposals according to the technical evaluation criteria. Financial proposals must quote rates and amounts in both figures and words according to the bill of quantities, and bids must be signed as directed in the tender documents. Technical and financial proposals must be uploaded as PDF files through the Punjab e-Procurement System. Bids by telegraph or post will not be accepted.
For both schemes, the submission deadline is 9 November 2026 at 9:30 a.m., and technical proposals will be opened at 10:00 a.m. the same day. Financial proposals of technically responsive bidders will be opened at a date and time communicated after the technical evaluation results. If the opening day is a public holiday, opening will take place on the next working day.
Each e-bid must include digital bid security equal to 5% of the estimated cost, in favour of Lahore Development Authority, processed through the e-Procurement System in collaboration with Bank of Punjab. Corrupt or virus-containing bid files will be rejected. Conditional bids will not be accepted. Contractors are responsible for applicable taxes when payments are released. The responsible officer is Asrar Saeed Khan, Chief Engineer-I, LDA.
Documents, submission and contact
- Documents from
- Punjab e-Procurement System: https://ep.punjab.gov.pk/
- Submit to
- Punjab e-Procurement System: https://ep.punjab.gov.pk/
- Contact
- Asrar Saeed Khan — Chief Engineer-I, LDA
Published in
Listed from a public newspaper advertisement. Verify dates, fees and submission requirements with Lahore Development Authority, UD Wing before bidding. Listing PT-468.