Live · Saturday, 28 November 2026 3,816 tenders 2,092 open 27 closing today 759 this week +138 this morning Install app Archive RSS Contact
PakistanTenders.pk Daily digest
Browse Goods1,415 Works1,194 Auction607 Services457 Consultancy143 Notices50 Closing today27 This week759 Corrigenda EOI
Works 17 days left

Construction of Iqbal Sector Group-C Missing Links, Jhelum Road, Sutlej Road and M & N Blocks in LDA City Lahore by Lahore Development Authority

Submission deadline 15 Dec 2026, 09:30 17 days left
Bid opening15 Dec 2026, 10:00
Bid security5% of bid value
MethodSingle stage, two envelope

Similar works tenders

All works →
Newspaper clipping of the notice: Construction of Iqbal Sector Group-C Missing Links, Jhelum Road, Sutlej Road and M & N Blocks in LDA City Lahore by Lahore Development Authority
The notice as printed in Nai Baat, 28 Nov 2026. The clipping is the authoritative text. View full size

What is being procured

Lahore Development Authority, UD Wing invites item-rate electronic tenders for four construction schemes in LDA City, Lahore, under the single-stage two-envelope procedure, PPRA Rule 38(2)(a). Engineering firms and contractors must be registered on the Punjab e-Procurement System, hold a valid Pakistan Engineering Council licence in the relevant category, and have active filer NTN and PNTN status. Procurement will follow PPRA Rules 2014, as amended.

The first scheme is construction of missing links of Iqbal Sector, Group-C, and allied areas in LDA City, Lahore. Its estimated cost is Rs. 666,653,863, with bid security of Rs. 33,332,693, a completion period of six months, and eligibility for PEC category C-2 and above. The second scheme is construction and upgradation of Jhelum Road and allied areas, including land reclamation, in LDA City, Lahore. Its estimated cost is Rs. 97,082,752, with bid security of Rs. 4,854,138, a completion period of four months, and eligibility for PEC category C-4 and above.

The third scheme is construction and upgradation of Sutlej Road and allied areas, including land reclamation, in LDA City, Lahore. Its estimated cost is Rs. 70,732,103, with bid security of Rs. 3,536,605, a completion period of four months, and eligibility for PEC category C-4 and above. The fourth scheme is construction and upgradation of M & N Blocks, along with surrounding areas including land reclamation, in LDA City, Lahore. Its estimated cost is Rs. 67,750,593, with bid security of Rs. 3,387,530, a completion period of four months, and eligibility for PEC category C-4 and above.

Firms may register and obtain technical and financial bidding documents through the Punjab e-Procurement System at https://ep.punjab.gov.pk/. Documents become available upon uploading of the notice. Technical proposals must satisfy the technical evaluation criteria. Financial proposals must quote tender rates and amounts in figures and words according to the bill of quantities, and tender documents must be signed as directed. Both proposals must be uploaded as PDF files through the system under Regulation 5(4) of PPRA Regulations 2024. Telegraphic and postal tenders will not be accepted.

The submission deadline for all four schemes is 15 December 2026 at 9:30 am. Technical proposals will open that day at 10:00 am. Financial proposals of technically responsive bidders will open at a subsequently announced date and time. If the opening day is a public holiday, opening will take place on the next working day.

Each e-bid must include digital bid security equal to 5% of the estimated cost, in favour of Lahore Development Authority, processed through the e-Procurement System in collaboration with Bank of Punjab. Conditional bids will not be accepted. Contractors are responsible for applicable taxes at payment. The notice is issued by Asrar Saeed Khan, Chief Engineer-I, LDA.

Documents, submission and contact

Documents from
Punjab e-Procurement System: https://ep.punjab.gov.pk/
Submit to
Punjab e-Procurement System: https://ep.punjab.gov.pk/
Contact
Asrar Saeed Khan — Chief Engineer-I, LDA

Published in

Listed from a public newspaper advertisement. Verify dates, fees and submission requirements with Lahore Development Authority, UD Wing before bidding. Listing PT-3883. Report an error · Corrections policy

Pinch to zoomScroll or double-click to zoom
Newspaper clipping of the notice: Construction of Iqbal Sector Group-C Missing Links, Jhelum Road, Sutlej Road and M & N Blocks in LDA City Lahore by Lahore Development Authority
StatCounter - Free Web Tracker and Counter