Rewinding of Electric Motor and Supply of Bearings for Awami Canal Pumping Station by Sadiqia Canal Division Bahawalnagar
Official documents
- Tender notice The invitation to bid as the department published it
- Bidding document Specifications, conditions and forms for preparing a bid
These open the department's own files on the official website; PakistanTenders.pk does not keep copies. Check there for corrigenda before you bid.
Similar works tenders
All works →-
Municipal Committee Haroonabad Provision of Storm Water Facilities in Haroonabad City by Municipal Committee Haroonabad -
Municipal Committee Chishtian Provision of Storm Water Facilities in Chishtian City by Municipal Committee Chishtian -
Municipal Committee Bahawalnagar Revenue Component for Library at Sutluj Park by Municipal Committee Bahawalnagar -
The Urban Sector Planning and Management Services Unit Pvt. Limited Office Renovation, Glass Partition and Electrification Works for The Urban Unit -
Executive Engineer, Highways Division, Rahim Yar Khan Road Construction and Highway Material Supply by Highways Division Rahim Yar Khan -
Punjab Mineral Development Corporation Excavation of Incline PCP-14 for Coal Extraction by Punjab Mineral Development Corporation -
Allied Hospital-I, Faisalabad Repair of 10 Sliding Doors for Allied Hospital-I, Faisalabad -
Building Division No. 2 Rawalpindi Establishment of Maryam Nawaz Health Clinic at Village Salamber by Building Division No. 2 Rawalpindi
What is being procured
The Executive Engineer, Sadiqia Canal Division, Bahawalnagar invites electronic bids for two works at Awami Canal Pumping Station in Awami Canal Sub Division Minchinabad. Bidding will follow the single-stage, single-envelope procedure under PPRA Rules 2014, as amended. Bids must be submitted on an item-rate basis under the second biannual MRS system, covering 1 July to 31 December, for District Bahawalnagar.
The first work is rewinding the 250 kWh, 8-pole flange electric motor No. 4 at Awami Canal Pumping Station. Its estimated amount, excluding the cost of stone and PST, is Rs. 1,649,611. Earnest money is Rs. 82,480, representing 5%. The technical sanction reference is S.E BWN No.3079-WE dated 03.11.2026. The completion period is 20 days.
The second work is providing and supplying bearings for use in rewinding the 250 kWh, 8-pole flange electric motor No. 4 and 75 CS centrifugal pump No. 4 at the same pumping station. Its estimated amount, excluding the cost of stone and PST, is Rs. 1,221,185. Earnest money is Rs. 61,059, representing 5%. The technical sanction reference is S.E BWN No.3080-WE dated 03.11.2026. The completion period is 20 days.
Eligible engineering firms, contractors and joint ventures must have valid Pakistan Engineering Council registration in the relevant category for 2026-27 and registration on the Electronic Government Procurement e-Pak Acquisition and Disposal System. Contractors and service providers must also be registered with the Punjab Revenue Authority as service providers.
Bidding documents can be downloaded from https://eprocure.gov.pk and https://eproc.punjab.gov.pk immediately after publication and until 12:00 noon on 8 December 2026. Electronic bids must be submitted through the e-procurement system by that deadline. Bids will be opened at 12:30 PM on 8 December 2026 by the prescribed Tender Opening Committee in the office of the Executive Engineer, Sadiqia Canal Division, Bahawalnagar, in the presence of bidders or their representatives who wish to attend. Manual bids will not be accepted.
The original bid security instrument must reach the Tender Opening Committee before the electronic submission deadline in an envelope clearly marked with the bidding document number and title. A hard copy of the financial instrument must also be submitted to the Executive Engineer before opening, in addition to the copy uploaded as bid security. Failure to submit original bid security will make the bid non-responsive.
Bidders must quote their best and final prices; negotiations will not be accepted. Rates and totals must cover every item, and incomplete financial bids will not be considered. Applicable taxes will be deducted at source. Quantities, specifications, drawings and other conditions may be consulted during office hours on working days at the issuing office. Bidders must inspect the site at their own expense.
The successful bidder must execute an agreement with the Executive Engineer within seven days of the acceptance letter and submit a work schedule. A performance guarantee of 10% of the contract amount is required within the stipulated time under Rule 56. Testing costs are payable by the contractor. The procuring agency may reject all bids before acceptance under PPRA Rule 35.
Documents, submission and contact
- Documents from
- Office of the Executive Engineer, Sadiqia Canal Division, Bahawalnagar
- Submit to
- Electronic Government Procurement e-Pak Acquisition and Disposal System; original bid security to the Tender Opening Committee at the office of the Executive Engineer, Sadiqia Canal Division, Bahawalnagar
- Opening venue
- Office of the Executive Engineer, Sadiqia Canal Division, Bahawalnagar
Published in
-
PPRA Punjab 20 Nov 2026 Source page ↗